Search
Filters
Close
Vehicle Fitment CheckConfirm vehicle details before checkout
Secure SSL CheckoutYour data is always protected
Fast, Easy ShippingShips from trusted partners
Parts Legion on eBayVisit our store

Parts Legion product listing

Industrial Injection IND Injector-Reman Stock Fuel Injectors - AEPS

Industrial Injection Part number: AEPS Out of Stock - on backorder and will be dispatched once in stock.
Ready for checkout Secure this part for your build
$208.06
Secure checkout Availability and delivery details shown below Ask for fitment help
Availability: Out of Stock - on backorder and will be dispatched once in stock.
Part number: AEPS
Manufacturer: Industrial Injection
Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)
Special order — availability will be confirmed after purchase.

Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)

No vehicle listing found We do not have a vehicle-specific fitment row for this product yet.

This does not automatically mean the part is universal. Send us your year, make, model, trim, and the part number before ordering.

Ask fitment help